How to measure your area
- Rectangle or square: measure length and width in feet.
- Circle: measure straight across the widest point (the diameter).
- Triangle: measure the base and the height at a right angle to it.
- Ring around a tree: measure the outer diameter of the bed and the trunk (or the area you keep clear).
- Irregular bed: split it into simple shapes and add each one as a section.
Recommended depths by project
| Project | Typical material | Depth |
|---|---|---|
| Flower bed | Mulch | 2–3 in |
| Tree ring | Mulch | 2–3 in, kept off the trunk |
| Garden path | Pea gravel | 2–3 in |
| Gravel driveway | Crusher run base + #57 stone | 4–6 in base, 2–4 in top |
| New lawn | Topsoil | 4–6 in |
| Lawn top dressing | Compost | ¼–½ in |
| Raised bed | Topsoil / soil mix | Full bed height |
How much area does 1 cubic yard cover?
| Depth | Coverage of 1 cubic yard |
|---|---|
| 2 in | 162 sq ft |
| 3 in | 108 sq ft |
| 4 in | 81 sq ft |
How much does a cubic yard weigh?
| Material | Tons per cubic yard (typical) | Recommended depth |
|---|---|---|
| Shredded hardwood mulch | 0.20–0.40 t | 2–4 in |
| Pine bark nuggets / mulch | 0.20–0.30 t | 2–4 in |
| Pea gravel | 1.30–1.50 t | 2–4 in |
| Crushed stone (#57) | 1.35–1.50 t | 2–6 in |
| Crusher run / road base | 1.50–1.70 t | 4–8 in |
| River rock | 1.30–1.50 t | 2–4 in |
| Decomposed granite | 1.30–1.45 t | 2–4 in |
| Topsoil | 1.00–1.30 t | 0.25–6 in |
| Compost | 0.45–0.70 t | 0.25–3 in |
| Fill dirt | 1.10–1.30 t | 2–24 in |
| Sand (masonry / play) | 1.25–1.40 t | 1–12 in |
Typical values for loose material. Wet material is heavier; ask your supplier for their exact weight.
Frequently asked questions
How do I calculate cubic yards?
Multiply the area in square feet by the depth in inches, divide by 12 to get cubic feet, then divide by 27. For example, 324 sq ft at 3 inches is 81 cubic feet, or 3 cubic yards.
Is it cheaper to buy in bulk or in bags?
For small jobs under about 1 cubic yard, bags are often simpler. From roughly 2–3 cubic yards upward, bulk material from a landscape supply yard is usually much cheaper, even with a delivery fee.
Why add extra material?
Material settles and compacts, edges are rarely perfect, and some is lost while spreading. Adding 10–15 % avoids a second trip.